![]() |
menu powered by Milonic
|
log in |
You are here: | Comments and remarks to Wim Jonker Klunne |
ABB will construct two solar photovoltaic (PV) power plants for Eskom, South Africa’s national electricity provider. The pilot plants, each of one hectare, will be located on greenfield sites adjacent to the coal-fired power stations at Lethabo, in the Free State province, and Kendal in the Mpumalanga province. They will be the first of their kind built in the country. At the Kendal power station, ABB will provide a fixed tilt solar PV power plant with a station capacity of 620 kilowatts (kW) and production potential of 11,445,398 kilowatt hours (kWh) per year. At the Lethabo site, the installation will comprise a single-axis tracking solar PV power plant with a peaking capacity of 575 kW and a production potential of 12,491,479 kWh per year. The PV plants will be designed to operate independently to produce electrical power for use by the existing power stations and will be capable of remote operation and monitoring. The fast track projects are scheduled to be completed by November 2011 prior to the COP (Conference of Parties) 17 event on climate change to be held in Durban later that month. Additional information: ABB News date: 19/09/2011 |
|